THS7368EVM

Mfr. #: THS7368EVM
Өндіруші: Texas Instruments
Сипаттама: Amplifier IC Development Tools THS7368EVM Eval Mod
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: THS7368EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
THS7368EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Video Amplifiers type. 2.7 V to 5 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Amplifier IC Development Tools product type 1 of 100 Development Tools as subcategory

THS7368EVM Image

THS7368EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

THS7368EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Amplifier IC Development Tools
  • RoHS: E
  • Product: Evaluation Modules
  • Type: Video Amplifiers
  • Tool Is For Evaluation Of: THS7368
  • Operating Supply Voltage: 2.7 V to 5 V
  • Series: THS7368
  • Brand: Texas Instruments
  • Operating Supply Current: 24.5 mA
  • Product Type: Amplifier IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

THS7368EVM

THS7368EVM Specifications

THS7368EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Video Amplifiers.

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 2.7 V to 5 V.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Amplifier IC Development Tools

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
Top