TAS5715EVM

Mfr. #: TAS5715EVM
Өндіруші: Texas Instruments
Сипаттама: Audio IC Development Tools TAS5715EVM Eval Mod
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: TAS5715EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TAS5715EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Audio Amplifier type. 3.3 V operating supply voltage range Output power: 25 W Texas Instruments is a trusted brand for quality electronics Interface Type: USB Audio IC Development Tools product type 1 of 100 Development Tools as subcategory

TAS5715EVM Image

TAS5715EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TAS5715EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Audio IC Development Tools
  • RoHS: E
  • Product: Evaluation Modules
  • Type: Audio Amplifier
  • Tool Is For Evaluation Of: TAS5715PHP
  • Operating Supply Voltage: 3.3 V
  • Output Power: 25 W
  • Series: TAS5715
  • Brand: Texas Instruments
  • Interface Type: USB
  • Operating Supply Current: 56 mA
  • Product Type: Audio IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TAS5715EVM

TAS5715EVM Specifications

TAS5715EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Audio Amplifier.

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 3.3 V.

  • A: What is the Output Power of the product?

    Q: The Output Power of the product is 25 W.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: At what frequency does the Interface Type?

    Q: The product Interface Type is USB.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Audio IC Development Tools

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
Top