TAS3108EVM2

Mfr. #: TAS3108EVM2
Өндіруші: Texas Instruments
Сипаттама: Audio IC Development Tools TAS3108EVM2 Eval Mod
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: TAS3108EVM2 Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TAS3108EVM2 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Audio type. 15 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: I2C, I2S, USB Audio IC Development Tools product type 1 of 100 Development Tools as subcategory

TAS3108EVM2 Image

TAS3108EVM2

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TAS3108EVM2 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Audio IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Audio
  • Tool Is For Evaluation Of: TAS3108
  • Operating Supply Voltage: 15 V
  • Brand: Texas Instruments
  • Interface Type: I2C, I2S, USB
  • Operating Supply Current: 300 mA
  • Product Type: Audio IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TAS3108EVM2

TAS3108EVM2 Specifications

TAS3108EVM2 FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Audio.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 15 V

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the Interface Type?

    Q: The product Interface Type is I2C, I2S, USB.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Audio IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
Top