| Mfr. #: | PCM5142EVM-U |
|---|---|
| Өндіруші: | Texas Instruments |
| Сипаттама: | Audio IC Development Tools PCM5142 Eval Mod |
| Өміршеңдік кезең: | Осы өндірушіден жаңа. |
| Деректер тізімі: | PCM5142EVM-U Деректер тізімі |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Audio type. 2 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: 3-Wire Compatible with PCM5142. The product can operate at a maximum temperature of + 85 C. The minimum operating temperature of this product is - 25 C. Audio IC Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

PCM5142EVM-U Specifications
A: Is the cutoff frequency of the product Manufacturer?
Q: Yes, the product's Manufacturer is indeed Texas Instruments
A: What is the Product of the product?
Q: The Product of the product is Evaluation Modules.
A: At what frequency does the Type?
Q: The product Type is Audio.
A: Is the cutoff frequency of the product Operating Supply Voltage?
Q: Yes, the product's Operating Supply Voltage is indeed 2 V
A: At what frequency does the Brand?
Q: The product Brand is Texas Instruments.
A: Is the cutoff frequency of the product Interface Type?
Q: Yes, the product's Interface Type is indeed 3-Wire
A: Is the cutoff frequency of the product For Use With?
Q: Yes, the product's For Use With is indeed PCM5142
A: What is the Maximum Operating Temperature of the product?
Q: The Maximum Operating Temperature of the product is + 85 C.
A: What is the Minimum Operating Temperature of the product?
Q: The Minimum Operating Temperature of the product is - 25 C.
A: At what frequency does the Product Type?
Q: The product Product Type is Audio IC Development Tools.
A: At what frequency does the Factory Pack Quantity?
Q: The product Factory Pack Quantity is 1.
A: What is the Subcategory of the product?
Q: The Subcategory of the product is Development Tools.