PCM1864EVM

Mfr. #: PCM1864EVM
Өндіруші: Texas Instruments
Сипаттама: Audio IC Development Tools PCM1864EVM-SW Contr Evaluation Module
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: PCM1864EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
PCM1864EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Audio type. 5 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: USB Compatible with USB-I2X. Audio IC Development Tools product type 1 of 100 Development Tools as subcategory

PCM1864EVM Image

PCM1864EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

PCM1864EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Audio IC Development Tools
  • RoHS: Y
  • Product: Evaluation Boards
  • Type: Audio
  • Tool Is For Evaluation Of: PCM1864
  • Operating Supply Voltage: 5 V
  • Description/Function: Evaluation board for the PCM186x family of ADCs
  • Series: PCM1864
  • Brand: Texas Instruments
  • Interface Type: USB
  • For Use With: USB-I2X
  • Product Type: Audio IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

PCM1864EVM

PCM1864EVM Specifications

PCM1864EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: What is the Type of the product?

    Q: The Type of the product is Audio.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 5 V

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is USB.

  • A: What is the For Use With of the product?

    Q: The For Use With of the product is USB-I2X.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Audio IC Development Tools

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
Top