| Mfr. #: | OPT8241-CDK-EVM |
|---|---|
| Өндіруші: | Texas Instruments |
| Сипаттама: | Distance Sensor Development Tool OPT8241-CDK-EVM |
| Өміршеңдік кезең: | Осы өндірушіден жаңа. |
| Деректер тізімі: | OPT8241-CDK-EVM Деректер тізімі |


This product is manufactured by Texas Instruments. Distance Sensor Development Tool product type Evaluation Modules This device belongs to the Time-of-Flight (ToF) Sensor type. 5 V operating supply voltage range The minimum operating temperature of this product is 0 C. The product can operate at a maximum temperature of + 40 C. Texas Instruments is a trusted brand for quality electronics Interface Type: I2C, USB 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

OPT8241-CDK-EVM Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: Is the cutoff frequency of the product Product Type?
Q: Yes, the product's Product Type is indeed Distance Sensor Development Tool
A: Is the cutoff frequency of the product Product?
Q: Yes, the product's Product is indeed Evaluation Modules
A: At what frequency does the Type?
Q: The product Type is Time-of-Flight (ToF) Sensor.
A: Is the cutoff frequency of the product Operating Supply Voltage?
Q: Yes, the product's Operating Supply Voltage is indeed 5 V
A: Is the cutoff frequency of the product Minimum Operating Temperature?
Q: Yes, the product's Minimum Operating Temperature is indeed 0 C
A: Is the cutoff frequency of the product Maximum Operating Temperature?
Q: Yes, the product's Maximum Operating Temperature is indeed + 40 C
A: Is the cutoff frequency of the product Brand?
Q: Yes, the product's Brand is indeed Texas Instruments
A: At what frequency does the Interface Type?
Q: The product Interface Type is I2C, USB.
A: What is the Factory Pack Quantity of the product?
Q: The Factory Pack Quantity of the product is 1.
A: Is the cutoff frequency of the product Subcategory?
Q: Yes, the product's Subcategory is indeed Development Tools