OPT3001EVM

Mfr. #: OPT3001EVM
Өндіруші: Texas Instruments
Сипаттама: Optical Sensor Development Tools Ambient Light Sensor Eval Board
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: OPT3001EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
OPT3001EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Ambient Light Sensor type. 1.6 V to 3.6 V operating supply voltage range Dimensions of - Texas Instruments is a trusted brand for quality electronics Interface Type: I2C, USB The product can operate at a maximum temperature of + 85 C. The minimum operating temperature of this product is - 40 C. Optical Sensor Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.001022 oz of Unit Weight

OPT3001EVM Image

OPT3001EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

OPT3001EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Optical Sensor Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Ambient Light Sensor
  • Tool Is For Evaluation Of: OPT3001
  • Operating Supply Voltage: 1.6 V to 3.6 V
  • Description/Function: -
  • Dimensions: -
  • Series: OPT3001
  • Brand: Texas Instruments
  • Interface Type: I2C, USB
  • Maximum Operating Temperature: + 85 C
  • Minimum Operating Temperature: - 40 C
  • Product Type: Optical Sensor Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.001022 oz

OPT3001EVM

OPT3001EVM Specifications

OPT3001EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Ambient Light Sensor

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 1.6 V to 3.6 V

  • A: Is the cutoff frequency of the product Dimensions?

    Q: Yes, the product's Dimensions is indeed -

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is I2C, USB.

  • A: What is the Maximum Operating Temperature of the product?

    Q: The Maximum Operating Temperature of the product is + 85 C.

  • A: What is the Minimum Operating Temperature of the product?

    Q: The Minimum Operating Temperature of the product is - 40 C.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Optical Sensor Development Tools

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 0.001022 oz.

25 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
Top