LP8758EVM

Mfr. #: LP8758EVM
Өндіруші: Texas Instruments
Сипаттама: Power Management IC Development Tools LP8758EVM
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: LP8758EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LP8758EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Switching Controllers type. 4 V Input Voltage Bulk packaging for easy dispensing Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 14 oz of Unit Weight

LP8758EVM Image

LP8758EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LP8758EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Switching Controllers
  • Tool Is For Evaluation Of: LP8758
  • Input Voltage: 4 V
  • Packaging: Bulk
  • Description/Function: Evaluation Module for the LP8758
  • Series: LP8758
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 14 oz

LP8758EVM

LP8758EVM Specifications

LP8758EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: What is the Type of the product?

    Q: The Type of the product is Switching Controllers.

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 4 V.

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 14 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
Top