| Mfr. #: | LP87331Q1EVM |
|---|---|
| Өндіруші: | Texas Instruments |
| Сипаттама: | Power Management IC Development Tools SV601213-001 TDA3X |
| Өміршеңдік кезең: | Осы өндірушіден жаңа. |
| Деректер тізімі: | LP87331Q1EVM Деректер тізімі |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the PMIC Solutions type. 3.7 V Input Voltage Output current: 4 A Texas Instruments is a trusted brand for quality electronics Interface Type: I2C, USB Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 14 oz of Unit Weight

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LP87331Q1EVM Specifications
A: At what frequency does the Manufacturer?
Q: The product Manufacturer is Texas Instruments.
A: At what frequency does the Product?
Q: The product Product is Evaluation Modules.
A: What is the Type of the product?
Q: The Type of the product is PMIC Solutions.
A: Is the cutoff frequency of the product Input Voltage?
Q: Yes, the product's Input Voltage is indeed 3.7 V
A: Is the cutoff frequency of the product Output Current?
Q: Yes, the product's Output Current is indeed 4 A
A: Is the cutoff frequency of the product Brand?
Q: Yes, the product's Brand is indeed Texas Instruments
A: Is the cutoff frequency of the product Interface Type?
Q: Yes, the product's Interface Type is indeed I2C, USB
A: At what frequency does the Product Type?
Q: The product Product Type is Power Management IC Development Tools.
A: What is the Factory Pack Quantity of the product?
Q: The Factory Pack Quantity of the product is 1.
A: Is the cutoff frequency of the product Subcategory?
Q: Yes, the product's Subcategory is indeed Development Tools
A: At what frequency does the Unit Weight?
Q: The product Unit Weight is 14 oz.