LP87321Q1EVM

Mfr. #: LP87321Q1EVM
Өндіруші: Texas Instruments
Сипаттама: Power Management IC Development Tools SV601213-003 TDA3X
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: LP87321Q1EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LP87321Q1EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the PMIC Solutions type. 3.7 V Input Voltage Output current: 4 A Texas Instruments is a trusted brand for quality electronics Interface Type: I2C, USB Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 14 oz of Unit Weight

LP87321Q1EVM Image

LP87321Q1EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LP87321Q1EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: PMIC Solutions
  • Tool Is For Evaluation Of: LP87321-Q1
  • Input Voltage: 3.7 V
  • Output Current: 4 A
  • Series: LP87332-Q1
  • Brand: Texas Instruments
  • Interface Type: I2C, USB
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 14 oz

LP87321Q1EVM

LP87321Q1EVM Specifications

LP87321Q1EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is PMIC Solutions.

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 3.7 V.

  • A: What is the Output Current of the product?

    Q: The Output Current of the product is 4 A.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: At what frequency does the Interface Type?

    Q: The product Interface Type is I2C, USB.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 14 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
Top