| Mfr. #: | LMZ35003EVM-001 |
|---|---|
| Өндіруші: | Texas Instruments |
| Сипаттама: | Power Management IC Development Tools LMZ35003 EVAL MOD |
| Өміршеңдік кезең: | Осы өндірушіден жаңа. |
| Деректер тізімі: | LMZ35003EVM-001 Деректер тізімі |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Voltage Regulators - Switching Regulators type. 50 V Input Voltage Output Voltage is 15 V Output current: 2.5 A Texas Instruments is a trusted brand for quality electronics Compatible with LMZ35003. The product can operate at a maximum temperature of + 85 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory The product's SIMPLE SWITCHER is Blue Gecko. 1. 0.058564 oz of Unit Weight

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LMZ35003EVM-001 Specifications
A: At what frequency does the Manufacturer?
Q: The product Manufacturer is Texas Instruments.
A: Is the cutoff frequency of the product Product?
Q: Yes, the product's Product is indeed Evaluation Modules
A: What is the Type of the product?
Q: The Type of the product is Voltage Regulators - Switching Regulators.
A: At what frequency does the Input Voltage?
Q: The product Input Voltage is 50 V.
A: What is the Output Voltage of the product?
Q: The Output Voltage of the product is 15 V.
A: Is the cutoff frequency of the product Output Current?
Q: Yes, the product's Output Current is indeed 2.5 A
A: What is the Brand of the product?
Q: The Brand of the product is Texas Instruments.
A: At what frequency does the For Use With?
Q: The product For Use With is LMZ35003.
A: At what frequency does the Maximum Operating Temperature?
Q: The product Maximum Operating Temperature is + 85 C.
A: At what frequency does the Minimum Operating Temperature?
Q: The product Minimum Operating Temperature is - 40 C.
A: At what frequency does the Product Type?
Q: The product Product Type is Power Management IC Development Tools.
A: What is the Factory Pack Quantity of the product?
Q: The Factory Pack Quantity of the product is 1.
A: At what frequency does the Subcategory?
Q: The product Subcategory is Development Tools.
A: What is the Tradename of the product?
Q: The Tradename of the product is SIMPLE SWITCHER.
A: What is the Unit Weight of the product?
Q: The Unit Weight of the product is 0.058564 oz.