LMK03328EVM

Mfr. #: LMK03328EVM
Өндіруші: Texas Instruments
Сипаттама: Clock & Timer Development Tools LMK03328EVM
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: LMK03328EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LMK03328EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Clock Generators type. Frequency range: 156.25 MHz Bulk packaging for easy dispensing Texas Instruments is a trusted brand for quality electronics Interface Type: I2C, USB 3.3 V operating supply voltage range Clock & Timer Development Tools product type 1 of 100 Development Tools as subcategory 1. 1.827955 oz of Unit Weight

LMK03328EVM Image

LMK03328EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LMK03328EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Clock & Timer Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Clock Generators
  • Tool Is For Evaluation Of: LMK03328
  • Frequency: 156.25 MHz
  • Packaging: Bulk
  • Description/Function: Ultra-low-jitter clock generator evaluation module with 2 PLLs, 8 differential outputs, and 2 inputs
  • Series: LMK03328
  • Brand: Texas Instruments
  • Interface Type: I2C, USB
  • Operating Supply Voltage: 3.3 V
  • Product Type: Clock & Timer Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 1.827955 oz

LMK03328EVM

LMK03328EVM Specifications

LMK03328EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Clock Generators

  • A: What is the Frequency of the product?

    Q: The Frequency of the product is 156.25 MHz.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the Interface Type?

    Q: The product Interface Type is I2C, USB.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 3.3 V

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Clock & Timer Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 1.827955 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
Top