LM5166EVM-C50A

Mfr. #: LM5166EVM-C50A
Өндіруші: Texas Instruments
Сипаттама: Power Management IC Development Tools LM5166EVM-C50A 500MA
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: LM5166EVM-C50A Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LM5166EVM-C50A Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Voltage Regulators - Switching Regulators type. 3 V to 65 V Input Voltage Output Voltage is 5 V Output current: 500 mA Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

LM5166EVM-C50A Image

LM5166EVM-C50A

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LM5166EVM-C50A Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Voltage Regulators - Switching Regulators
  • Tool Is For Evaluation Of: LM5166
  • Input Voltage: 3 V to 65 V
  • Output Voltage: 5 V
  • Output Current: 500 mA
  • Series: LM5166
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

LM5166EVM-C50A

LM5166EVM-C50A Specifications

LM5166EVM-C50A FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Voltage Regulators - Switching Regulators.

  • A: Is the cutoff frequency of the product Input Voltage?

    Q: Yes, the product's Input Voltage is indeed 3 V to 65 V

  • A: At what frequency does the Output Voltage?

    Q: The product Output Voltage is 5 V.

  • A: What is the Output Current of the product?

    Q: The Output Current of the product is 500 mA.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
Top