| Mfr. #: | LM3017EVM |
|---|---|
| Өндіруші: | Texas Instruments |
| Сипаттама: | Power Management IC Development Tools LM3017EVM |
| Өміршеңдік кезең: | Осы өндірушіден жаңа. |
| Деректер тізімі: | LM3017EVM Деректер тізімі |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Switching Controllers type. 8 V to 12 V Input Voltage Output Voltage is 15 V Bulk packaging for easy dispensing Output current: 1 A Texas Instruments is a trusted brand for quality electronics Compatible with LM3017. The product can operate at a maximum temperature of + 125 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LM3017EVM Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: What is the Product of the product?
Q: The Product of the product is Evaluation Modules.
A: What is the Type of the product?
Q: The Type of the product is Switching Controllers.
A: What is the Input Voltage of the product?
Q: The Input Voltage of the product is 8 V to 12 V.
A: What is the Output Voltage of the product?
Q: The Output Voltage of the product is 15 V.
A: What is the Packaging of the product?
Q: The Packaging of the product is Bulk.
A: At what frequency does the Output Current?
Q: The product Output Current is 1 A.
A: Is the cutoff frequency of the product Brand?
Q: Yes, the product's Brand is indeed Texas Instruments
A: Is the cutoff frequency of the product For Use With?
Q: Yes, the product's For Use With is indeed LM3017
A: At what frequency does the Maximum Operating Temperature?
Q: The product Maximum Operating Temperature is + 125 C.
A: At what frequency does the Minimum Operating Temperature?
Q: The product Minimum Operating Temperature is - 40 C.
A: At what frequency does the Product Type?
Q: The product Product Type is Power Management IC Development Tools.
A: At what frequency does the Factory Pack Quantity?
Q: The product Factory Pack Quantity is 1.
A: At what frequency does the Subcategory?
Q: The product Subcategory is Development Tools.