INA225EVM

Mfr. #: INA225EVM
Өндіруші: Texas Instruments
Сипаттама: Amplifier IC Development Tools INA225 EVAL MOD
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: INA225EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
INA225EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Current Sense type. 0 V to 36 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Compatible with INA225. The product can operate at a maximum temperature of + 125 C. The minimum operating temperature of this product is - 40 C. Amplifier IC Development Tools product type 1 of 100 Development Tools as subcategory

INA225EVM Image

INA225EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

INA225EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Amplifier IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Current Sense
  • Tool Is For Evaluation Of: INA225
  • Operating Supply Voltage: 0 V to 36 V
  • Description/Function: INA225 evaluation module for 36 V programmable gain
  • Series: INA225
  • Brand: Texas Instruments
  • For Use With: INA225
  • Maximum Operating Temperature: + 125 C
  • Minimum Operating Temperature: - 40 C
  • Operating Supply Current: 0.35 mA
  • Product Type: Amplifier IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

INA225EVM

INA225EVM Specifications

INA225EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Current Sense

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 0 V to 36 V.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the For Use With of the product?

    Q: The For Use With of the product is INA225.

  • A: At what frequency does the Maximum Operating Temperature?

    Q: The product Maximum Operating Temperature is + 125 C.

  • A: At what frequency does the Minimum Operating Temperature?

    Q: The product Minimum Operating Temperature is - 40 C.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Amplifier IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
Top