| Mfr. #: | FRDM-HB2000-EVM |
|---|---|
| Өндіруші: | NXP Semiconductors |
| Сипаттама: | Power Management IC Development Tools Freedom Expansion Board- HB2000, 10 A H-B, RDSon 235mOhm max, Programmable Brushed DC Motor Driver |
| Өміршеңдік кезең: | Осы өндірушіден жаңа. |
| Деректер тізімі: | FRDM-HB2000-EVM Деректер тізімі |


This product is manufactured by NXP. Evaluation Modules This device belongs to the Motor / Motion Controllers & Drivers type. 5 V to 40 V Input Voltage NXP Semiconductors is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory This product is also known by the 935326276598 number of 934069005115. 1. 1 lb of Unit Weight

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

FRDM-HB2000-EVM Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is NXP.
A: What is the Product of the product?
Q: The Product of the product is Evaluation Modules.
A: Is the cutoff frequency of the product Type?
Q: Yes, the product's Type is indeed Motor / Motion Controllers & Drivers
A: Is the cutoff frequency of the product Input Voltage?
Q: Yes, the product's Input Voltage is indeed 5 V to 40 V
A: Is the cutoff frequency of the product Brand?
Q: Yes, the product's Brand is indeed NXP Semiconductors
A: At what frequency does the Product Type?
Q: The product Product Type is Power Management IC Development Tools.
A: Is the cutoff frequency of the product Factory Pack Quantity?
Q: Yes, the product's Factory Pack Quantity is indeed 1
A: Is the cutoff frequency of the product Subcategory?
Q: Yes, the product's Subcategory is indeed Development Tools
A: At what frequency does the Part # Aliases?
Q: The product Part # Aliases is 935326276598.
A: At what frequency does the Unit Weight?
Q: The product Unit Weight is 1 lb.