| Mfr. #: | FDC2214PROXSEN-EVM |
|---|---|
| Өндіруші: | Texas Instruments |
| Сипаттама: | Touch Sensor Development Tools FDC2214PROXSEN-EVM |
| Өміршеңдік кезең: | Осы өндірушіден жаңа. |
| Деректер тізімі: | FDC2214PROXSEN-EVM Деректер тізімі |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Capacitive Touch, Proximity Sensor type. 3.3 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: JTAG, UART Compatible with FDC2214, MSP430FR5969, TPS61029. Touch Sensor Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

FDC2214PROXSEN-EVM Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: At what frequency does the Product?
Q: The product Product is Evaluation Modules.
A: What is the Type of the product?
Q: The Type of the product is Capacitive Touch, Proximity Sensor.
A: What is the Operating Supply Voltage of the product?
Q: The Operating Supply Voltage of the product is 3.3 V.
A: What is the Brand of the product?
Q: The Brand of the product is Texas Instruments.
A: At what frequency does the Interface Type?
Q: The product Interface Type is JTAG, UART.
A: At what frequency does the For Use With?
Q: The product For Use With is FDC2214, MSP430FR5969, TPS61029.
A: What is the Product Type of the product?
Q: The Product Type of the product is Touch Sensor Development Tools.
A: What is the Factory Pack Quantity of the product?
Q: The Factory Pack Quantity of the product is 1.
A: Is the cutoff frequency of the product Subcategory?
Q: Yes, the product's Subcategory is indeed Development Tools