EVM430-FR6989

Mfr. #: EVM430-FR6989
Өндіруші: Texas Instruments
Сипаттама: Development Boards & Kits - Other Processors Water meter ref Eval Module
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: EVM430-FR6989 Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
EVM430-FR6989 Overview

This product is manufactured by Texas Instruments. Evaluation Kits This product's MSP430 is an ARM Cortex M3. Bulk packaging for easy dispensing Texas Instruments is a trusted brand for quality electronics Interface Type: I2C, SPI, UART, USB This product has a Data Bus Width of 16 bit. 3.3 V operating supply voltage range Development Boards & Kits - Other Processors product type 1 of 100 Development Tools as subcategory The product's MSP430 is Blue Gecko.

EVM430-FR6989 Image

EVM430-FR6989

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

EVM430-FR6989 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Development Boards & Kits - Other Processors
  • RoHS: N
  • Series: MSP430FR6989
  • Product: Evaluation Kits
  • Core: MSP430
  • Tool Is For Evaluation Of: MSP430FR6989
  • Packaging: Bulk
  • Description/Function: Water meter reference design - extended scan interface (ESI) enabled, ultra-low power MSP430FR6989
  • Brand: Texas Instruments
  • Interface Type: I2C, SPI, UART, USB
  • Data Bus Width: 16 bit
  • Operating Supply Voltage: 3.3 V
  • Product Type: Development Boards & Kits - Other Processors
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Tradename: MSP430

EVM430-FR6989

EVM430-FR6989 Specifications

EVM430-FR6989 FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Kits

  • A: Is the cutoff frequency of the product Core?

    Q: Yes, the product's Core is indeed MSP430

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Interface Type?

    Q: Yes, the product's Interface Type is indeed I2C, SPI, UART, USB

  • A: At what frequency does the Data Bus Width?

    Q: The product Data Bus Width is 16 bit.

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 3.3 V.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Development Boards & Kits - Other Processors

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

  • A: At what frequency does the Tradename?

    Q: The product Tradename is MSP430.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
Top