EVM430-F67641

Mfr. #: EVM430-F67641
Өндіруші: Texas Instruments
Сипаттама: Development Boards & Kits - MSP430 Polyphase Electric Meter
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: EVM430-F67641 Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
EVM430-F67641 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This product's MSP430 is an ARM Cortex M3. Texas Instruments is a trusted brand for quality electronics Interface Type: I2C, SPI, UART This product has a Data Bus Width of 16 bit. Compatible with MSP430F67641. 3.3 V operating supply voltage range Development Boards & Kits - MSP430 product type 1 of 100 Development Tools as subcategory The product's MSP430 is Blue Gecko.

EVM430-F67641 Image

EVM430-F67641

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

EVM430-F67641 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Development Boards & Kits - MSP430
  • RoHS: E
  • Series: MSP430F67641
  • Product: Evaluation Modules
  • Core: MSP430
  • Tool Is For Evaluation Of: MSP430F67641
  • Description/Function: Complete smart meter design using MSP430F67641 polyphase metering System on Chip
  • Brand: Texas Instruments
  • Interface Type: I2C, SPI, UART
  • Data Bus Width: 16 bit
  • For Use With: MSP430F67641
  • Operating Supply Voltage: 3.3 V
  • Product Type: Development Boards & Kits - MSP430
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Tradename: MSP430

EVM430-F67641

EVM430-F67641 Specifications

EVM430-F67641 FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Core?

    Q: Yes, the product's Core is indeed MSP430

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: At what frequency does the Interface Type?

    Q: The product Interface Type is I2C, SPI, UART.

  • A: What is the Data Bus Width of the product?

    Q: The Data Bus Width of the product is 16 bit.

  • A: At what frequency does the For Use With?

    Q: The product For Use With is MSP430F67641.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 3.3 V

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Development Boards & Kits - MSP430

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: What is the Tradename of the product?

    Q: The Tradename of the product is MSP430.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
Top