DS90UB954-Q1EVM

Mfr. #: DS90UB954-Q1EVM
Өндіруші: Texas Instruments
Сипаттама: Interface Development Tools DS90UB954Q1FPDLnkIII CameraDeseriaEvalMod
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: DS90UB954-Q1EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DS90UB954-Q1EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Deserializer type. Texas Instruments is a trusted brand for quality electronics Interface Type: I2C, USB 5 V operating supply voltage range Interface Development Tools product type 1 of 100 Development Tools as subcategory

DS90UB954-Q1EVM Image

DS90UB954-Q1EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DS90UB954-Q1EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Interface Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Deserializer
  • Tool Is For Evaluation Of: DS90UB954-Q1
  • Description/Function: Evaluates the DS90UB954-Q1 deserializer
  • Series: DS90UB954-Q1
  • Brand: Texas Instruments
  • Interface Type: I2C, USB
  • Operating Supply Voltage: 5 V
  • Product Type: Interface Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

DS90UB954-Q1EVM

DS90UB954-Q1EVM Specifications

DS90UB954-Q1EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: What is the Type of the product?

    Q: The Type of the product is Deserializer.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: Is the cutoff frequency of the product Interface Type?

    Q: Yes, the product's Interface Type is indeed I2C, USB

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 5 V

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Interface Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

22 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
Top