DS90UB924-Q1EVM

Mfr. #: DS90UB924-Q1EVM
Өндіруші: Texas Instruments
Сипаттама: Interface Development Tools DS90UB924-Q1EVM IS DEMOSTRATION KIT
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: DS90UB924-Q1EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DS90UB924-Q1EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the FPD-Link III Deserializer type. The AEC-Q100 Qualification Texas Instruments is a trusted brand for quality electronics Interface Type: I2C Compatible with DS90UB924-Q1. The product can operate at a maximum temperature of + 105 C. The minimum operating temperature of this product is - 40 C. 3.3 V, 5 V operating supply voltage range Interface Development Tools product type 1 of 100 Development Tools as subcategory

DS90UB924-Q1EVM Image

DS90UB924-Q1EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DS90UB924-Q1EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Interface Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: FPD-Link III Deserializer
  • Tool Is For Evaluation Of: DS90UB924-Q1
  • Qualification: AEC-Q100
  • Series: DS90UB924-Q1
  • Brand: Texas Instruments
  • Interface Type: I2C
  • For Use With: DS90UB924-Q1
  • Maximum Operating Temperature: + 105 C
  • Minimum Operating Temperature: - 40 C
  • Operating Supply Voltage: 3.3 V, 5 V
  • Product Type: Interface Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

DS90UB924-Q1EVM

DS90UB924-Q1EVM Specifications

DS90UB924-Q1EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is FPD-Link III Deserializer.

  • A: At what frequency does the Qualification?

    Q: The product Qualification is AEC-Q100.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is I2C.

  • A: Is the cutoff frequency of the product For Use With?

    Q: Yes, the product's For Use With is indeed DS90UB924-Q1

  • A: At what frequency does the Maximum Operating Temperature?

    Q: The product Maximum Operating Temperature is + 105 C.

  • A: What is the Minimum Operating Temperature of the product?

    Q: The Minimum Operating Temperature of the product is - 40 C.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 3.3 V, 5 V

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Interface Development Tools

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
Top