| Mfr. #: | DS125BR820EVM |
|---|---|
| Өндіруші: | Texas Instruments |
| Сипаттама: | Interface Development Tools DS125BR820EVM |
| Өміршеңдік кезең: | Осы өндірушіден жаңа. |
| Деректер тізімі: | DS125BR820EVM Деректер тізімі |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Repeater type. Texas Instruments is a trusted brand for quality electronics Compatible with DS125BR820NJY. The product can operate at a maximum temperature of + 85 C. The minimum operating temperature of this product is - 40 C. 2.5 V, 3.3 V operating supply voltage range Interface Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DS125BR820EVM Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: What is the Product of the product?
Q: The Product of the product is Evaluation Modules.
A: At what frequency does the Type?
Q: The product Type is Repeater.
A: Is the cutoff frequency of the product Brand?
Q: Yes, the product's Brand is indeed Texas Instruments
A: What is the For Use With of the product?
Q: The For Use With of the product is DS125BR820NJY.
A: At what frequency does the Maximum Operating Temperature?
Q: The product Maximum Operating Temperature is + 85 C.
A: What is the Minimum Operating Temperature of the product?
Q: The Minimum Operating Temperature of the product is - 40 C.
A: At what frequency does the Operating Supply Voltage?
Q: The product Operating Supply Voltage is 2.5 V, 3.3 V.
A: Is the cutoff frequency of the product Product Type?
Q: Yes, the product's Product Type is indeed Interface Development Tools
A: What is the Factory Pack Quantity of the product?
Q: The Factory Pack Quantity of the product is 1.
A: At what frequency does the Subcategory?
Q: The product Subcategory is Development Tools.