DRV8880EVM

Mfr. #: DRV8880EVM
Өндіруші: Texas Instruments
Сипаттама: Power Management IC Development Tools DRV8880EVM
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: DRV8880EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV8880EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Motor / Motion Controllers & Drivers type. 6.5 V to 45 V Input Voltage Bulk packaging for easy dispensing Output current: 2 A Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

DRV8880EVM Image

DRV8880EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8880EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Motor / Motion Controllers & Drivers
  • Tool Is For Evaluation Of: DRV8880
  • Input Voltage: 6.5 V to 45 V
  • Packaging: Bulk
  • Description/Function: DRV8880 dual half-bridge motor driver evaluation module
  • Output Current: 2 A
  • Series: DRV8880
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

DRV8880EVM

DRV8880EVM Specifications

DRV8880EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Motor / Motion Controllers & Drivers.

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 6.5 V to 45 V.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: What is the Output Current of the product?

    Q: The Output Current of the product is 2 A.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
Top