DRV8844EVM

Mfr. #: DRV8844EVM
Өндіруші: Texas Instruments
Сипаттама: Power Management IC Development Tools DRV8844 Eval Mod
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: DRV8844EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV8844EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Power Management Specialized type. 8 V to 60 V Input Voltage Output current: 3.5 A Texas Instruments is a trusted brand for quality electronics Interface Type: USB Compatible with DRV8844. The product can operate at a maximum temperature of + 85 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

DRV8844EVM Image

DRV8844EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8844EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Power Management Specialized
  • Tool Is For Evaluation Of: DRV8844
  • Input Voltage: 8 V to 60 V
  • Description/Function: Platform revolving around the DRV8844, medium voltage, quad half-H bridge driver
  • Output Current: 3.5 A
  • Series: DRV8844
  • Brand: Texas Instruments
  • Interface Type: USB
  • For Use With: DRV8844
  • Maximum Operating Temperature: + 85 C
  • Minimum Operating Temperature: - 40 C
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

DRV8844EVM

DRV8844EVM Specifications

DRV8844EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: What is the Type of the product?

    Q: The Type of the product is Power Management Specialized.

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 8 V to 60 V.

  • A: At what frequency does the Output Current?

    Q: The product Output Current is 3.5 A.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: Is the cutoff frequency of the product Interface Type?

    Q: Yes, the product's Interface Type is indeed USB

  • A: Is the cutoff frequency of the product For Use With?

    Q: Yes, the product's For Use With is indeed DRV8844

  • A: At what frequency does the Maximum Operating Temperature?

    Q: The product Maximum Operating Temperature is + 85 C.

  • A: What is the Minimum Operating Temperature of the product?

    Q: The Minimum Operating Temperature of the product is - 40 C.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
Top