DRV8838EVM

Mfr. #: DRV8838EVM
Өндіруші: Texas Instruments
Сипаттама: Power Management IC Development Tools DRV8838 EVAL MOD
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: DRV8838EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV8838EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Motor / Motion Controllers & Drivers type. 11 V Input Voltage Output current: 1.8 A Texas Instruments is a trusted brand for quality electronics Compatible with DRV8838. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

DRV8838EVM Image

DRV8838EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8838EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Motor / Motion Controllers & Drivers
  • Tool Is For Evaluation Of: DRV8838
  • Input Voltage: 11 V
  • Description/Function: DRV8838 integrated motor driver evaluation module
  • Output Current: 1.8 A
  • Series: DRV8838
  • Brand: Texas Instruments
  • For Use With: DRV8838
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

DRV8838EVM

DRV8838EVM Specifications

DRV8838EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Motor / Motion Controllers & Drivers.

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 11 V.

  • A: At what frequency does the Output Current?

    Q: The product Output Current is 1.8 A.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: Is the cutoff frequency of the product For Use With?

    Q: Yes, the product's For Use With is indeed DRV8838

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
Top