DRV8805EVM

Mfr. #: DRV8805EVM
Өндіруші: Texas Instruments
Сипаттама: Power Management IC Development Tools DRV8805EVM
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: DRV8805EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV8805EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules Texas Instruments is a trusted brand for quality electronics Interface Type: USB The product can operate at a maximum temperature of + 85 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.160198 oz of Unit Weight

DRV8805EVM Image

DRV8805EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8805EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Tool Is For Evaluation Of: DRV8805
  • Series: DRV8805
  • Brand: Texas Instruments
  • Interface Type: USB
  • Maximum Operating Temperature: + 85 C
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.160198 oz

DRV8805EVM

DRV8805EVM Specifications

DRV8805EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is USB.

  • A: What is the Maximum Operating Temperature of the product?

    Q: The Maximum Operating Temperature of the product is + 85 C.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

  • A: At what frequency does the Unit Weight?

    Q: The product Unit Weight is 0.160198 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
Top