DRV8432EVM

Mfr. #: DRV8432EVM
Өндіруші: Texas Instruments
Сипаттама: Power Management IC Development Tools DRV8432 Eval Mod
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: DRV8432EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV8432EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Motor / Motion Controllers & Drivers type. 12 V Input Voltage Output Voltage is 0 V to 52.5 V Output current: 14 A Texas Instruments is a trusted brand for quality electronics Compatible with DRV8432. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

DRV8432EVM Image

DRV8432EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8432EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Boards
  • Type: Motor / Motion Controllers & Drivers
  • Tool Is For Evaluation Of: DRV8432
  • Input Voltage: 12 V
  • Output Voltage: 0 V to 52.5 V
  • Description/Function: Dual full-bridge PWM motor driver
  • Output Current: 14 A
  • Series: DRV8432
  • Brand: Texas Instruments
  • For Use With: DRV8432
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

DRV8432EVM

DRV8432EVM Specifications

DRV8432EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: At what frequency does the Type?

    Q: The product Type is Motor / Motion Controllers & Drivers.

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 12 V.

  • A: Is the cutoff frequency of the product Output Voltage?

    Q: Yes, the product's Output Voltage is indeed 0 V to 52.5 V

  • A: At what frequency does the Output Current?

    Q: The product Output Current is 14 A.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: Is the cutoff frequency of the product For Use With?

    Q: Yes, the product's For Use With is indeed DRV8432

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
Top