DRV612EVM

Mfr. #: DRV612EVM
Өндіруші: Texas Instruments
Сипаттама: Audio IC Development Tools DRV612EVM
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: DRV612EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV612EVM Overview

This product is manufactured by Texas Instruments. 3.3 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Audio IC Development Tools product type 1 of 100 Development Tools as subcategory

DRV612EVM Image

DRV612EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV612EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Audio IC Development Tools
  • RoHS: N/A
  • Tool Is For Evaluation Of: DRV612
  • Operating Supply Voltage: 3.3 V
  • Series: DRV612
  • Brand: Texas Instruments
  • Product Type: Audio IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

DRV612EVM

DRV612EVM Specifications

DRV612EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 3.3 V

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Audio IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
Top