DRV2667EVM-CT

Mfr. #: DRV2667EVM-CT
Өндіруші: Texas Instruments
Сипаттама: Power Management IC Development Tools EVM for Piezo Haptic Driver
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: DRV2667EVM-CT Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV2667EVM-CT Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Motor / Motion Controllers & Drivers type. 3 V to 5.5 V Input Voltage Texas Instruments is a trusted brand for quality electronics Interface Type: I2C, USB Compatible with MSP-EXP430G2. The product can operate at a maximum temperature of + 85 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

DRV2667EVM-CT Image

DRV2667EVM-CT

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV2667EVM-CT Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: Motor / Motion Controllers & Drivers
  • Tool Is For Evaluation Of: DRV2667
  • Input Voltage: 3 V to 5.5 V
  • Description/Function: Complete demo and evaluation platform
  • Series: DRV2667
  • Brand: Texas Instruments
  • Interface Type: I2C, USB
  • For Use With: MSP-EXP430G2
  • Maximum Operating Temperature: + 85 C
  • Minimum Operating Temperature: - 40 C
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

DRV2667EVM-CT

DRV2667EVM-CT Specifications

DRV2667EVM-CT FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Motor / Motion Controllers & Drivers.

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 3 V to 5.5 V.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the Interface Type?

    Q: The product Interface Type is I2C, USB.

  • A: Is the cutoff frequency of the product For Use With?

    Q: Yes, the product's For Use With is indeed MSP-EXP430G2

  • A: At what frequency does the Maximum Operating Temperature?

    Q: The product Maximum Operating Temperature is + 85 C.

  • A: At what frequency does the Minimum Operating Temperature?

    Q: The product Minimum Operating Temperature is - 40 C.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

11 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
Top