| Mfr. #: | DRV110EVM |
|---|---|
| Өндіруші: | Texas Instruments |
| Сипаттама: | Power Management IC Development Tools Eval Mod for DRV110 |
| Өміршеңдік кезең: | Осы өндірушіден жаңа. |
| Деректер тізімі: | DRV110EVM Деректер тізімі |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Current Mode PWM Controllers type. 7 V to 48 V, 100 V to 240 V Input Voltage Texas Instruments is a trusted brand for quality electronics Compatible with DRV110, DRV120. The product can operate at a maximum temperature of + 35 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV110EVM Specifications
A: Is the cutoff frequency of the product Manufacturer?
Q: Yes, the product's Manufacturer is indeed Texas Instruments
A: At what frequency does the Product?
Q: The product Product is Evaluation Modules.
A: At what frequency does the Type?
Q: The product Type is Current Mode PWM Controllers.
A: What is the Input Voltage of the product?
Q: The Input Voltage of the product is 7 V to 48 V, 100 V to 240 V.
A: At what frequency does the Brand?
Q: The product Brand is Texas Instruments.
A: What is the For Use With of the product?
Q: The For Use With of the product is DRV110, DRV120.
A: At what frequency does the Maximum Operating Temperature?
Q: The product Maximum Operating Temperature is + 35 C.
A: What is the Minimum Operating Temperature of the product?
Q: The Minimum Operating Temperature of the product is - 40 C.
A: Is the cutoff frequency of the product Product Type?
Q: Yes, the product's Product Type is indeed Power Management IC Development Tools
A: At what frequency does the Factory Pack Quantity?
Q: The product Factory Pack Quantity is 1.
A: Is the cutoff frequency of the product Subcategory?
Q: Yes, the product's Subcategory is indeed Development Tools