DLPDLCR2010EVM

Mfr. #: DLPDLCR2010EVM
Өндіруші: Texas Instruments
Сипаттама: Display Development Tools DLP LightCrafter Display 2010 EVM
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: DLPDLCR2010EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DLPDLCR2010EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules 5 V operating supply voltage range Interface Type: Audio, HDMI, I2C, JTAG, USB Texas Instruments is a trusted brand for quality electronics Display Development Tools product type 1 of 100 Development Tools as subcategory The product's DLP is Blue Gecko. 1. 1.247 lbs of Unit Weight

DLPDLCR2010EVM Image

DLPDLCR2010EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DLPDLCR2010EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Display Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Tool Is For Evaluation Of: DLP2010
  • Operating Supply Voltage: 5 V
  • Interface Type: Audio, HDMI, I2C, JTAG, USB
  • Description/Function: DLP LightCrafter display 2010 evaluation module
  • Series: DLPDLCR2010
  • Brand: Texas Instruments
  • Product Type: Display Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Tradename: DLP
  • Unit Weight: 1.247 lbs

DLPDLCR2010EVM

DLPDLCR2010EVM Specifications

DLPDLCR2010EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 5 V.

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is Audio, HDMI, I2C, JTAG, USB.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Display Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

  • A: What is the Tradename of the product?

    Q: The Tradename of the product is DLP.

  • A: At what frequency does the Unit Weight?

    Q: The product Unit Weight is 1.247 lbs.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
Top