DAC70508EVM

Mfr. #: DAC70508EVM
Өндіруші: Texas Instruments
Сипаттама: Data Conversion IC Development Tools DAC80508EVM
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: DAC70508EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DAC70508EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the DAC type. 2.7 V to 5.5 V operating supply voltage range Bulk packaging for easy dispensing Texas Instruments is a trusted brand for quality electronics Interface Type: SPI Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

DAC70508EVM Image

DAC70508EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC70508EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Boards
  • Type: DAC
  • Tool Is For Evaluation Of: DAC70508EVM
  • Operating Supply Voltage: 2.7 V to 5.5 V
  • Packaging: Bulk
  • Description/Function: Voltage Output DAC with Internal Reference
  • Series: DAC70508
  • Brand: Texas Instruments
  • Interface Type: SPI
  • Operating Supply Current: 20 mA
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

DAC70508EVM

DAC70508EVM Specifications

DAC70508EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed DAC

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 2.7 V to 5.5 V

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Interface Type?

    Q: Yes, the product's Interface Type is indeed SPI

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Data Conversion IC Development Tools

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
Top