DAC5672EVM

Mfr. #: DAC5672EVM
Өндіруші: Texas Instruments
Сипаттама: Data Conversion IC Development Tools DAC5672 Eval Mod
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: DAC5672EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DAC5672EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the DAC type. Texas Instruments is a trusted brand for quality electronics Interface Type: I2C, SMA Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 9.120012 oz of Unit Weight

DAC5672EVM Image

DAC5672EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC5672EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Boards
  • Type: DAC
  • Tool Is For Evaluation Of: DAC5672
  • Series: DAC5672
  • Brand: Texas Instruments
  • Interface Type: I2C, SMA
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 9.120012 oz

DAC5672EVM

DAC5672EVM Specifications

DAC5672EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: What is the Type of the product?

    Q: The Type of the product is DAC.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: Is the cutoff frequency of the product Interface Type?

    Q: Yes, the product's Interface Type is indeed I2C, SMA

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Data Conversion IC Development Tools

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: At what frequency does the Unit Weight?

    Q: The product Unit Weight is 9.120012 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
Top