DAC5662EVM

Mfr. #: DAC5662EVM
Өндіруші: Texas Instruments
Сипаттама: Data Conversion IC Development Tools EVM - 12 bit 200 MSPS Dual DAC
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: DAC5662EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DAC5662EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the DAC type. Texas Instruments is a trusted brand for quality electronics Interface Type: I2C, SMA Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

DAC5662EVM Image

DAC5662EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC5662EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Boards
  • Type: DAC
  • Tool Is For Evaluation Of: DAC5662
  • Series: DAC5662
  • Brand: Texas Instruments
  • Interface Type: I2C, SMA
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

DAC5662EVM

DAC5662EVM Specifications

DAC5662EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: At what frequency does the Type?

    Q: The product Type is DAC.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: Is the cutoff frequency of the product Interface Type?

    Q: Yes, the product's Interface Type is indeed I2C, SMA

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Data Conversion IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
Top