CDCLVP1102EVM

Mfr. #: CDCLVP1102EVM
Өндіруші: Texas Instruments
Сипаттама: Clock & Timer Development Tools CDCLVP1102 Eval Mod
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: CDCLVP1102EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
CDCLVP1102EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Clock Buffers type. Frequency range: 200 MHz, 2 GHz Texas Instruments is a trusted brand for quality electronics 2.375 V to 3.6 V operating supply voltage range Clock & Timer Development Tools product type 1 of 100 Development Tools as subcategory

CDCLVP1102EVM Image

CDCLVP1102EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

CDCLVP1102EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Clock & Timer Development Tools
  • RoHS: N/A
  • Product: Evaluation Boards
  • Type: Clock Buffers
  • Tool Is For Evaluation Of: CDCLVP1102
  • Frequency: 200 MHz, 2 GHz
  • Series: CDCLVP1102
  • Brand: Texas Instruments
  • Operating Supply Voltage: 2.375 V to 3.6 V
  • Product Type: Clock & Timer Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

CDCLVP1102EVM

CDCLVP1102EVM Specifications

CDCLVP1102EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is Clock Buffers.

  • A: What is the Frequency of the product?

    Q: The Frequency of the product is 200 MHz, 2 GHz.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 2.375 V to 3.6 V.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Clock & Timer Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
Top