BQ27510EVM

Mfr. #: BQ27510EVM
Өндіруші: Texas Instruments
Сипаттама: Power Management IC Development Tools BQ27510 Eval Mod
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: BQ27510EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
BQ27510EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Battery Management type. 2.6 V to 4.5 V Input Voltage Texas Instruments is a trusted brand for quality electronics Interface Type: USB Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

BQ27510EVM Image

BQ27510EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ27510EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Boards
  • Type: Battery Management
  • Tool Is For Evaluation Of: BQ27x10
  • Input Voltage: 2.6 V to 4.5 V
  • Series: BQ27510
  • Brand: Texas Instruments
  • Interface Type: USB
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

BQ27510EVM

BQ27510EVM Specifications

BQ27510EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Battery Management

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 2.6 V to 4.5 V.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Interface Type?

    Q: Yes, the product's Interface Type is indeed USB

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
Top