BQ25970EVM-893

Mfr. #: BQ25970EVM-893
Өндіруші: Texas Instruments
Сипаттама: Power Management IC Development Tools BQ25970EVM-893
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: BQ25970EVM-893 Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
BQ25970EVM-893 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Battery Management type. 12 V Input Voltage Output Voltage is 3 V to 6 V Output current: 8 A Texas Instruments is a trusted brand for quality electronics The product can operate at a maximum temperature of + 85 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

BQ25970EVM-893 Image

BQ25970EVM-893

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ25970EVM-893 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: Battery Management
  • Tool Is For Evaluation Of: BQ25970
  • Input Voltage: 12 V
  • Output Voltage: 3 V to 6 V
  • Output Current: 8 A
  • Series: bq25970
  • Brand: Texas Instruments
  • Maximum Operating Temperature: + 85 C
  • Minimum Operating Temperature: - 40 C
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

BQ25970EVM-893

BQ25970EVM-893 Specifications

BQ25970EVM-893 FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Battery Management.

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 12 V.

  • A: Is the cutoff frequency of the product Output Voltage?

    Q: Yes, the product's Output Voltage is indeed 3 V to 6 V

  • A: Is the cutoff frequency of the product Output Current?

    Q: Yes, the product's Output Current is indeed 8 A

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the Maximum Operating Temperature of the product?

    Q: The Maximum Operating Temperature of the product is + 85 C.

  • A: At what frequency does the Minimum Operating Temperature?

    Q: The product Minimum Operating Temperature is - 40 C.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

13 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
Top