BQ25710EVM-017

Mfr. #: BQ25710EVM-017
Өндіруші: Texas Instruments
Сипаттама: Power Management IC Development Tools BQ25710EVM-732
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: BQ25710EVM-017 Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
BQ25710EVM-017 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Power Distributions type. 3.5 V to 24 V Input Voltage Output Voltage is 19.2 V Output current: 8 A Texas Instruments is a trusted brand for quality electronics Compatible with BQ2571x. The product can operate at a maximum temperature of + 125 C. The minimum operating temperature of this product is 0 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

BQ25710EVM-017 Image

BQ25710EVM-017

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ25710EVM-017 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: Power Distributions
  • Tool Is For Evaluation Of: BQ2571x
  • Input Voltage: 3.5 V to 24 V
  • Output Voltage: 19.2 V
  • Description/Function: BQ2571x evaluation module
  • Output Current: 8 A
  • Series: BQ25710
  • Brand: Texas Instruments
  • For Use With: BQ2571x
  • Maximum Operating Temperature: + 125 C
  • Minimum Operating Temperature: 0 C
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

BQ25710EVM-017

BQ25710EVM-017 Specifications

BQ25710EVM-017 FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Power Distributions

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 3.5 V to 24 V.

  • A: What is the Output Voltage of the product?

    Q: The Output Voltage of the product is 19.2 V.

  • A: What is the Output Current of the product?

    Q: The Output Current of the product is 8 A.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: Is the cutoff frequency of the product For Use With?

    Q: Yes, the product's For Use With is indeed BQ2571x

  • A: What is the Maximum Operating Temperature of the product?

    Q: The Maximum Operating Temperature of the product is + 125 C.

  • A: What is the Minimum Operating Temperature of the product?

    Q: The Minimum Operating Temperature of the product is 0 C.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

13 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
Top