BQ24770EVM-540

Mfr. #: BQ24770EVM-540
Өндіруші: Texas Instruments
Сипаттама: Power Management IC Development Tools BQ24770EVM-540
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: BQ24770EVM-540 Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
BQ24770EVM-540 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Charge Pumps type. 19 V Input Voltage Output Voltage is - Output current: 8 A Texas Instruments is a trusted brand for quality electronics Compatible with BQ2477x. The product can operate at a maximum temperature of + 125 C. The minimum operating temperature of this product is 0 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.184021 oz of Unit Weight

BQ24770EVM-540 Image

BQ24770EVM-540

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ24770EVM-540 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: Charge Pumps
  • Tool Is For Evaluation Of: BQ2477x
  • Input Voltage: 19 V
  • Output Voltage: -
  • Output Current: 8 A
  • Series: BQ24773
  • Brand: Texas Instruments
  • For Use With: BQ2477x
  • Maximum Operating Temperature: + 125 C
  • Minimum Operating Temperature: 0 C
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.184021 oz

BQ24770EVM-540

BQ24770EVM-540 Specifications

BQ24770EVM-540 FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Charge Pumps.

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 19 V.

  • A: What is the Output Voltage of the product?

    Q: The Output Voltage of the product is -.

  • A: Is the cutoff frequency of the product Output Current?

    Q: Yes, the product's Output Current is indeed 8 A

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the For Use With of the product?

    Q: The For Use With of the product is BQ2477x.

  • A: What is the Maximum Operating Temperature of the product?

    Q: The Maximum Operating Temperature of the product is + 125 C.

  • A: What is the Minimum Operating Temperature of the product?

    Q: The Minimum Operating Temperature of the product is 0 C.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 0.184021 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
Top