BQ24251EVM-150

Mfr. #: BQ24251EVM-150
Өндіруші: Texas Instruments
Сипаттама: Power Management IC Development Tools BQ24251 EVAL MOD
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: BQ24251EVM-150 Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
BQ24251EVM-150 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Battery Management type. 4.35 V to 10.5 V Input Voltage Output Voltage is 4.2 V Output current: 2 A Texas Instruments is a trusted brand for quality electronics Interface Type: USB Compatible with bq24251. The product can operate at a maximum temperature of + 125 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

BQ24251EVM-150 Image

BQ24251EVM-150

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ24251EVM-150 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: Battery Management
  • Tool Is For Evaluation Of: bq24251
  • Input Voltage: 4.35 V to 10.5 V
  • Output Voltage: 4.2 V
  • Description/Function: Evaluation Module for the bq24251
  • Output Current: 2 A
  • Series: BQ24251
  • Brand: Texas Instruments
  • Interface Type: USB
  • For Use With: bq24251
  • Maximum Operating Temperature: + 125 C
  • Minimum Operating Temperature: - 40 C
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

BQ24251EVM-150

BQ24251EVM-150 Specifications

BQ24251EVM-150 FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Battery Management.

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 4.35 V to 10.5 V.

  • A: At what frequency does the Output Voltage?

    Q: The product Output Voltage is 4.2 V.

  • A: At what frequency does the Output Current?

    Q: The product Output Current is 2 A.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: At what frequency does the Interface Type?

    Q: The product Interface Type is USB.

  • A: What is the For Use With of the product?

    Q: The For Use With of the product is bq24251.

  • A: What is the Maximum Operating Temperature of the product?

    Q: The Maximum Operating Temperature of the product is + 125 C.

  • A: What is the Minimum Operating Temperature of the product?

    Q: The Minimum Operating Temperature of the product is - 40 C.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
Top