BQ24192EVM-021

Mfr. #: BQ24192EVM-021
Өндіруші: Texas Instruments
Сипаттама: Power Management IC Development Tools BQ24192 EVAL MOD
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: BQ24192EVM-021 Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
BQ24192EVM-021 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Battery Management type. 3.9 V to 17 V Input Voltage Output Voltage is 3.7 V Output current: 4 A Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

BQ24192EVM-021 Image

BQ24192EVM-021

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ24192EVM-021 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: Battery Management
  • Tool Is For Evaluation Of: BQ24192
  • Input Voltage: 3.9 V to 17 V
  • Output Voltage: 3.7 V
  • Output Current: 4 A
  • Series: BQ24196
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

BQ24192EVM-021

BQ24192EVM-021 Specifications

BQ24192EVM-021 FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Battery Management

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 3.9 V to 17 V.

  • A: At what frequency does the Output Voltage?

    Q: The product Output Voltage is 3.7 V.

  • A: What is the Output Current of the product?

    Q: The Output Current of the product is 4 A.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
Top