BQ24100EVM

Mfr. #: BQ24100EVM
Өндіруші: Texas Instruments
Сипаттама: Power Management IC Development Tools BQ24100 Eval Mod
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: BQ24100EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
BQ24100EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Battery Management type. 5 V Input Voltage Output Voltage is 4.2 V Dimensions of 50.8 mm x 47 mm Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.084736 oz of Unit Weight

BQ24100EVM Image

BQ24100EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ24100EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Boards
  • Type: Battery Management
  • Tool Is For Evaluation Of: BQ24100
  • Input Voltage: 5 V
  • Output Voltage: 4.2 V
  • Dimensions: 50.8 mm x 47 mm
  • Series: BQ24100
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.084736 oz

BQ24100EVM

BQ24100EVM Specifications

BQ24100EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is Battery Management.

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 5 V.

  • A: Is the cutoff frequency of the product Output Voltage?

    Q: Yes, the product's Output Voltage is indeed 4.2 V

  • A: At what frequency does the Dimensions?

    Q: The product Dimensions is 50.8 mm x 47 mm.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 0.084736 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
Top