BQ24045EVM

Mfr. #: BQ24045EVM
Өндіруші: Texas Instruments
Сипаттама: Power Management IC Development Tools BQ24045 EVAL MOD
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: BQ24045EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
BQ24045EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Battery Management type. 30 V Input Voltage Output Voltage is 4.2 V Output current: 1.25 A Texas Instruments is a trusted brand for quality electronics Interface Type: USB Compatible with bq2404x. The product can operate at a maximum temperature of + 150 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

BQ24045EVM Image

BQ24045EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ24045EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: Battery Management
  • Tool Is For Evaluation Of: BQ2404x
  • Input Voltage: 30 V
  • Output Voltage: 4.2 V
  • Description/Function: Evaluation Module for the bq2404x
  • Output Current: 1.25 A
  • Series: BQ24045
  • Brand: Texas Instruments
  • Interface Type: USB
  • For Use With: bq2404x
  • Maximum Operating Temperature: + 150 C
  • Minimum Operating Temperature: - 40 C
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

BQ24045EVM

BQ24045EVM Specifications

BQ24045EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Battery Management

  • A: Is the cutoff frequency of the product Input Voltage?

    Q: Yes, the product's Input Voltage is indeed 30 V

  • A: At what frequency does the Output Voltage?

    Q: The product Output Voltage is 4.2 V.

  • A: At what frequency does the Output Current?

    Q: The product Output Current is 1.25 A.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the Interface Type?

    Q: The product Interface Type is USB.

  • A: What is the For Use With of the product?

    Q: The For Use With of the product is bq2404x.

  • A: What is the Maximum Operating Temperature of the product?

    Q: The Maximum Operating Temperature of the product is + 150 C.

  • A: What is the Minimum Operating Temperature of the product?

    Q: The Minimum Operating Temperature of the product is - 40 C.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
Top