AMC1303EVM

Mfr. #: AMC1303EVM
Өндіруші: Texas Instruments
Сипаттама: Data Conversion IC Development Tools AMC1303EVM
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: AMC1303EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
AMC1303EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Data Acquisitions type. 5 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.141331 oz of Unit Weight

AMC1303EVM Image

AMC1303EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

AMC1303EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: Data Acquisitions
  • Tool Is For Evaluation Of: AMC1303
  • Operating Supply Voltage: 5 V
  • Description/Function: Evaluates the AMC1303 single-channel delta-sigma modulator
  • Series: AMC1303
  • Brand: Texas Instruments
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.141331 oz

AMC1303EVM

AMC1303EVM Specifications

AMC1303EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Data Acquisitions

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 5 V

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Data Conversion IC Development Tools

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 0.141331 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
Top