ADS8412EVM

Mfr. #: ADS8412EVM
Өндіруші: Texas Instruments
Сипаттама: Data Conversion IC Development Tools ADS8412 Eval Mod
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: ADS8412EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS8412EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the ADC type. 3.3 V to 5 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: SMA Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

ADS8412EVM Image

ADS8412EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS8412EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Boards
  • Type: ADC
  • Tool Is For Evaluation Of: ADS8412
  • Operating Supply Voltage: 3.3 V to 5 V
  • Series: ADS8412
  • Brand: Texas Instruments
  • Interface Type: SMA
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

ADS8412EVM

ADS8412EVM Specifications

ADS8412EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is ADC.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 3.3 V to 5 V

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: At what frequency does the Interface Type?

    Q: The product Interface Type is SMA.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Data Conversion IC Development Tools

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
Top