| Mfr. #: | ADS5403EVM |
|---|---|
| Өндіруші: | Texas Instruments |
| Сипаттама: | Data Conversion IC Development Tools ADS5403EVM |
| Өміршеңдік кезең: | Осы өндірушіден жаңа. |
| Деректер тізімі: | ADS5403EVM Деректер тізімі |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the ADC type. 5 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: SMA connector Compatible with ADS540x, ADS54T0x. The product can operate at a maximum temperature of + 85 C. The minimum operating temperature of this product is - 40 C. Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS5403EVM Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: What is the Product of the product?
Q: The Product of the product is Evaluation Modules.
A: Is the cutoff frequency of the product Type?
Q: Yes, the product's Type is indeed ADC
A: Is the cutoff frequency of the product Operating Supply Voltage?
Q: Yes, the product's Operating Supply Voltage is indeed 5 V
A: Is the cutoff frequency of the product Brand?
Q: Yes, the product's Brand is indeed Texas Instruments
A: At what frequency does the Interface Type?
Q: The product Interface Type is SMA connector.
A: Is the cutoff frequency of the product For Use With?
Q: Yes, the product's For Use With is indeed ADS540x, ADS54T0x
A: What is the Maximum Operating Temperature of the product?
Q: The Maximum Operating Temperature of the product is + 85 C.
A: At what frequency does the Minimum Operating Temperature?
Q: The product Minimum Operating Temperature is - 40 C.
A: At what frequency does the Product Type?
Q: The product Product Type is Data Conversion IC Development Tools.
A: What is the Factory Pack Quantity of the product?
Q: The Factory Pack Quantity of the product is 1.
A: What is the Subcategory of the product?
Q: The Subcategory of the product is Development Tools.