ADC12DL3200EVM

Mfr. #: ADC12DL3200EVM
Өндіруші: Texas Instruments
Сипаттама: Data Conversion IC Development Tools ADC12DL3200EVM
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: ADC12DL3200EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADC12DL3200EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the ADC type. 5 V, 12 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: SPI, USB Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

ADC12DL3200EVM Image

ADC12DL3200EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADC12DL3200EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: ADC
  • Tool Is For Evaluation Of: ADC12DL3200
  • Operating Supply Voltage: 5 V, 12 V
  • Series: ADC12DL3200
  • Brand: Texas Instruments
  • Interface Type: SPI, USB
  • Operating Supply Current: 3 A
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

ADC12DL3200EVM

ADC12DL3200EVM Specifications

ADC12DL3200EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is ADC.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 5 V, 12 V

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: At what frequency does the Interface Type?

    Q: The product Interface Type is SPI, USB.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Data Conversion IC Development Tools

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
Top